F16 - 30 years serving Portugal
Portuguese Air Force F16 - 30 years serving Portugal
Portuguese Air Force F16 - 30 years serving Portugal
UK flag PT flag

Early Days
The Choice
PA I
The Founders
The Beginning
QRA
Air Exclusion
Deployments
TLP
Determined Falcon
Allied Force
Pilot Exchange
Red Flag
TACEVAL
PA II
MNFP
EPAF
ETS
Lean - BA5
FWIT
Smart Weapons
Test Pilots
M-Series/S-Series
1st Squadron MLU
NATO Defense
White Flags
100% MLU
Alienation
Simulators
100K Hours
Safety
  • Early Days
  • The Choice
  • PA I
  • The Founders
  • The Beginning
  • QRA
  • Air Exclusion
  • Deployments
  • TLP
  • Determined Falcon
  • Allied Force
  • Pilot Exchange
  • Red Flag
  • TACEVAL
  • PA II
  • MNFP
  • EPAF
  • ETS
  • Lean - BA5
  • FWIT
  • Smart Weapons
  • Test Pilots
  • M-Series/S-Series
  • 1st Squadron MLU
  • NATO Defense
  • White Flags
  • 100% MLU
  • Alienation
  • Simulators
  • 100K Hours
  • Safety
LEAN BA5 LEAN BA5

Lean - Air Base 5

The implementation of Lean techniques in the F-16 modernization program at Air Base 5 involved applying efficient management principles to optimize maintenance and operational processes. This included reorganizing workflows, standardizing procedures, and implementing continuous improvement practices.

With Lean, Air Base 5 managed to increase operational efficiency, reduce aircraft downtime, and improve the overall availability of the F-16 fleet, thus ensuring greater operational readiness while minimizing operational costs.

Patch LEAN BA5

Lean found its greatest significance through DOCA 4.

DOCA 4 played a crucial role in the program for modifications and upgrades of the F-16 fighters to the MLU standard. Located at Air Base 5, it was responsible for conducting scheduled and unscheduled maintenance inspections, repairs, and deep inspections on the F-16 aircraft, ensuring that the Air Force's F-16 fleet could maintain optimal conditions for effective readiness.

*Lean - LEAN is a management philosophy that involves the entire organization, focusing on the elimination of waste (non-value-added activities) through continuous improvement, affecting the entire organizational chain, reducing costs and delivery times while increasing the quality of services provided.

Patch LEAN BA5
LEAN BA5
LEAN BA5
LEAN BA5
LEAN BA5
Previous Next

COPYRIGHT © 2024 - 2025 FAP | DCSI